Stadium design details revealed
November 16, 2007

So what's the deal with the new redesign of Red Bull Park that is pushing back its building? A poster on the MetroFanatic boards has revealed the following details, as well as the rendering of the proposed stadium:

If the full design is to be completed by the end of this year, construction is scheduled to end in June 2009.

  • The new design has no stage, full seating all around.
  • Stadium now has a wavy translucent roof that covers all seating. The West side (main entrance) has a flatter translucent roof.
  • Number of suites has been drastically reduced. Only two levels of suites along the West touchline.
  • There is no upper bowl seating on the West side because of the suites.
  • It doesn't look like there is any prep for future suites on other sides.
  • Player entrance is on the West touchline. There is club seating each side of mid-field on the West side, but the press is right next to the entrance tunnel.
  • Locker rooms and operations offices are on first floor of West side.
  • Press room and equipment is second floor of West side.
  • Pub is located on the third floor behind the club seating with direct access.
  • Club for suites is on fourth floor of West side behind the suites.
  • Real grass field.
  • Front wall of seating is only seven yards from the touchlines.
  • •  News Archive
    •  Rumor Mill
    •  Weekly Awards
    •  Season Ratings
    •  Last Game Ratings

    •  History Overview
    •  All-Time Roster
    •  All-Time Results
    •  All-Time Stats
    •  Team Records
    •  Hall of Fame
    •  All-Time XI
    •  Numeric Roster
    •  International Roster
    •  Coaching History
    •  Captain History
    •  Draft History
    •  Trophy Case
    •  Transfer Records
    •  Frivolities
    •  Honors History
    •  Award History
    •  Ratings History

    Home · Team · News · History · Boards · Stuff · About